In this issue |
|
We present an overview of the second EIC STEP Scale up results of 2026, followed by the cumulative data. |
Q2 2026 results |
![]() |
|
24 proposals were submitted for the second round of evaluations in 2026. Among these, 17 were invited to the interview with independent high-level experts, representing 71% of the total proposals. This meant that 7 – 29% – were deemed inadmissible or ineligible for some reason or other. Of the 17 invited to the interview, 6 met all the eligibility and evaluation criteria and will proceed to the EIC Fund for investment decision, subject to due diligence. This accounts for 35% of those invited to the jury interview and 25% of the total proposals submitted. |
![]() |
|
The 6 selected companies came from four different countries: France got three companies to pass the evaluation phase and proceed to the EIC Fund for an investment decision; while Estonia, Germany, and The Netherlands, all got one each. For the first time, a company from Estonia wins the EIC STEP Scale Up funding. |
Q2 2026 winners |
|
The six selected companies are listed below:
|
Cumulative results |
![]() |
|
Since the introduction of the STEP Scale Up funding scheme in the EIC Work Programme 2025, a total of 172 proposals have been submitted for evaluations. Among these, 108 were invited to the interview with independent high-level experts, representing 63% of the total proposals. This meant that 64 – 37% – were deemed inadmissible or ineligible for some reason or other. Of the 108 invited to the interview, 33 met all the eligibility and evaluation criteria and have proceeded to the EIC Fund for investment decision, subject to due diligence. This accounts for 31% of those invited to the jury interview and 19% of the total proposals submitted. |
![]() |
|
The 33 selected companies have now come from 9 different countries: France is now leading with nine companies; Germany is still second with eight companies and The Netherlands takes third place with seven companies; Bulgaria, Denmark, and Spain have two each; while Estonia, Finland, and Israel have one each. |
![]() |
EIC Accelerator to EIC STEP Scale Up correlation |
|
As a key later-stage financing option for European deep-tech companies, we find it interesting to correlate the relationship between the companies selected for STEP Scale Up funding and whether they have previously been awarded EIC Accelerator funding. In this analysis, we include those funded under the Horizon 2020 SME Instrument Phase 2 or EIC Accelerator Pilot (precursors of the EIC Accelerator). |
![]() |
|
Among the six new companies that have passed the evaluation phase and proceeded to the EIC Fund for investment decision, four previously received EIC Accelerator funding – 67%. These companies are Cailabs, SiPearl, Skeleton Technologies Group, and Vsora. Of the total 33 selected companies, 23 have now previously received EIC Accelerator funding – 70%. |
Final thoughts |
|
In the recent EIC News Article, dated 28 July 2026, it was announced that if negotiations are successful, the companies may receive a combined €97 million of equity investments (between €10 and €30 million per company). Considering the EIC STEP Scale Up programme has a budget of €300M, according to the EIC Work Programme 2026, and 146.5 million was already committed in the first round of evaluations in 2026, this means that 81% of the funding scheme’s budget has already been allocated. For the final two deadlines of 2026 – 9th September and 25th November 2026 – we can therefore expect an available budget of €56.5 million. Interestingly, this represents a slight deviation from the EIC’s rule of allocating a maximum of no more than 70% of the available budget for the calendar year within the first six months of the year. |

Swiss start-ups that meet the following criteria:

Start-ups can submit their applications on an ongoing basis on Innolink, the Innosuisse application platform.
For each thematic subgroup, there are four Innovation Council meetings per year. To enter the next round of meetings, start-ups should submit their applications at least eight weeks in advance. After the meeting date, a decision is communicated within 8 weeks.

Companies successful on the first step will be invited to pitch in front of experts and members of the Innovation Council. Companies will receive an invite within two weeks of the pitch date. Following the pitch, the Innovation Council will inform the start-up of approval or rejection.
If approved, the start-up will receive a subsidy contract from Innosuisse before the project starts.
| Energy & Environment | Engineering | ICT | Life Sciences | Social Sciences & Business Management | |
|---|---|---|---|---|---|
| Meeting | 06.03 | 04.03 | 11.03 | 09.03 | 05.03 |
| Pitch | 26.03 | 25.03 | 25.03 | 25.03 | 18.03 |
| Energy & Environment | Engineering | ICT | Life Sciences | Social Sciences & Business Management | |
|---|---|---|---|---|---|
| Meeting | 22.05 | 20.05 | 20.05 | 19.05 | 21.05 |
| Pitch | 05.06 | 03.06 | 03.06 | 10.06 | 28.05 |
| Energy & Environment | Engineering | ICT | Life Sciences | Social Sciences & Business Management | |
|---|---|---|---|---|---|
| Meeting | 11.09 | 09.09 | 09.09 | 15.09 | 10.09 |
| Pitch | 25.09 | 23.09 | 23.09 | 28.09 | 17.09 |
| Energy & Environment | Engineering | ICT | Life Sciences | Social Sciences & Business Management | |
|---|---|---|---|---|---|
| Meeting | 27.11 | 25.11 | 25.11 | 19.11 | 25.11 |
| Pitch | 11.12 | 09.12 | 09.12 | 03.12 | 03.12 |
Contact us to learn more about the Innosuisse Start-up Innovation Projects
Sustainability is built on three different levels, each equally important:

We develop decision support tools that rigorously models the entire product and process value chain. By comparing this model with industry benchmarks, we can identify the process steps that have the greatest impact. This enables us to propose and test targeted solutions aimed at mitigating these impacts effectively.
Based on:
ISO 14040:
Environmental management – Life cycle assessment – Principles and framework
ISO 14044:
Environmental management – Life cycle assessment – Requirements and guidelines



The call is exclusively for SMEs established in widening countries, which include:



Companies interested in applying must meet the following criteria:
The call targets technologies and innovations within the categories listed below.
| Advanced semiconductors | Microelectronics, including processors; photonic including high energy laser technologies; high frequency chips; semiconductor manufacturing equipment at very advanced node sizes; space-qualified semiconductor technologies |
| Artificial intelligence | AI algorithms; high performance computing (HPC); cloud and edge computing; data analytics technologies; computer vision, language processing, object recognition; privacy-preserving technologies (e.g., federated learning) |
| Quantum | Quantum computing; quantum cryptography; quantum communications; Quantum Key Distribution (QKD); quantum sensing including quantum gravimetry; quantum radar; quantum simulation; quantum imaging; quantum clocks; metrology; space qualified quantum technologies |
| Advanced connectivity, navigation, and digital | Secure digital communications and connectivity, such as RAN (Radio Access Network) & Open RAN (Radio Access Network), and 5G and 6G; cyber security technologies including cyber- surveillance, security and intrusion systems, digital forensics; internet of things and virtual reality; distributed ledger and digital identity technologies; guidance, navigation, and control technologies, including avionics and maritime positioning, and space-based PNT; satellite-based secure connectivity |
| Advanced sensing technologies | Electro-optical, radar, chemical, biological, radiation and distributed sensing; magnetometers, magnetic gradiometers; underwater electric field sensors; gravity meters, and gradiometers |
| Robotics and autonomous systems | Autonomous habited and uninhabited vehicles (space, air, land, surface, and underwater), including swarming; robots and robot-controlled precision systems; exoskeletons; AI-enabled systems |
| Sustainable alternative fuels | Sustainable alternative fuels technologies |
| Other nuclear | Other nuclear technologies |
| Wind and electric propulsion technologies for transportation | Wind propulsion technologies; electric propulsion technologies |
| CO2 transport and utilisation | CO2 transport technologies; CO2 utilisation technologies |
| Transformative industrial technologies for decarbonisation | Transformative industrial technologies for decarbonisation |
| Biotech climate and energy solutions | Biotech climate and energy solutions |
| Renewable fuels of non-biological origin | Renewable fuels of non-biological origin technologies |
| Energy system-related energy efficiency | Energy system-related energy efficiency technologies; heat grid technologies; other energy system-related energy efficiency technologies |
| Other renewable energy | Osmotic energy technologies; ambient energy technologies, other than heat pumps; biomass technologies; landfill gas technologies; sewage treatment plant gas technologies; other renewable energy technologies |
| Hydropower | Hydropower technologies |
| Solar | Solar photovoltaic technologies; solar thermal electric technologies; solar thermal technologies; other solar technologies |
| Nuclear fission | Nuclear fission energy technologies; nuclear fuel cycle technologies |
| Electricity grid | Electricity grid technologies; electric charging technologies for transportation; technologies to digitalise the grid; other electricity grid technologies |
| Carbon capture and storage | Carbon capture technologies; carbon storage technologies |
| Sustainable biogas and biomethane | Sustainable biogas technologies; sustainable bio-methane technologies |
| Hydrogen | Electrolysers; hydrogen fuel cells; other hydrogen technologies |
| Heat pumps and geothermal energy | Heat pump technologies; geothermal energy technologies |
| Battery and energy storage | Battery technologies; energy storage technologies |
| Onshore wind and offshore renewable | Onshore wind technologies; offshore renewable technologies |
| Advanced materials, manufacturing and recycling | Technologies for nanomaterials; smart materials; advanced ceramic materials; stealth materials; safe and sustainable by design materials; additive manufacturing; digital controlled micro-precision manufacturing and small-scale laser machining/welding; technologies for extraction; processing and recycling of cri- tical raw materials and other components (e.g. catalyst, batteries), including hydrometallurgical extraction, bioleaching, nanotechnology-based filtration, electrochemical processing and black mass |
| Technologies vital to sustainability such as water purification and desalination | Purification and desalination technologies |
| Circular economy technologies | Technologies for the reuse and recycling of electronics (e-waste); circular bioeconomy technologies (e.g., for converting waste to valuable bio-based materials or energy) |
| DNA/RNA | Genomics; pharmacogenomics; gene probes; genetic engineering; DNA/RNA sequencing/synthesis/amplification; gene expression profiling, and use of antisense technology; large-scale DNA synthesis; new genomic techniques; gene drive. |
| Proteins and other molecules | Sequencing/synthesis/engineering/manufacturing of proteins and peptides (including large molecule hormones); improved delivery methods for large molecule drugs; proteomics; protein isolation and purification; signalling; identification of cell receptors; developing polyclonal products. |
| Cell and tissue culture and engineering | Cell/tissue culture; tissue engineering (including tissue scaffolds and biomedical engineering); cellular fusion; marker assisted breeding technologies; metabolic engineering; cell therapies; bioprinting of cells/replacement organs |
| Process biotechnology techniques | Fermentation using bioreactors; biorefining; bioprocessing; bioleaching; biopulping; biobleaching; biodesulphurisation; bioremediation; biosensing; biofiltration and phytoremediation; molecular aquaculture; protection and decontamination including human decontaminating agents; biocatalysis, novel test techniques suitable for high throughput screening; process improvement and delivery optimisation for biopharmaceuticals and advanced therapy medicinal products |
| Gene and RNA vectors | Gene therapy; viral vectors |
| Bioinformatics | Construction of databases on genomes; protein sequences; modelling complex biological processes; including systems biology; developing personalised genomics |
| Nanobiotechnology | Application of the tools and processes of nano/microfabrication to build devices for studying biosystems and applications in drug delivery, diagnostics, manufacturing. |

Applicants have to upload/submit on the EU Funding and Tenders Portal:
Applications will be reviewed in batches (one round of reviews every quarter) and applicants will be informed of results 4-6 weeks before the Face-to-Face Interview.
Full application deadlines 2027:
28/01
29/04
06/09
24/11

Companies successful on the first step will be invited to the second step, a Face-to-Face Interview in front of a max. 6-person jury. The EIC will inform applicants of results within 2 weeks of the interview. The outcome may be one of three possibilities: 1) GO and Sovereignty (STEP) Seal; 2) NO GO and Sovereignty (STEP) Seal; and 3) NO GO.
If GO, companies will go through due diligence and a negotiation on the investment agreement with the EIC Fund.
To apply, you must:

Applicants are free to decide and indicate which activities are required to accelerate the development, growth, and sustainability of the business. Examples include:
The programme runs through a two-stage application process:
An online application form to verify eligibility, submitted via the Sploro platform.
The Eligibility Strand runs with weekly cut-offs every Tuesday*, from a first cut-off on 30 June 2026 until a final cut-off on 14 June 2027.
Results are communicated within a week.
If the Eligibility Strand application is non-eligible, you can reapply 3 times
The Full Proposal is also submitted via the Sploro platform. It comprises of the following:
There are 3 cut-offs in 2027 for the Full Proposal Strand:
Results are communicated within 8 weeks.
If the Full Proposal application is rejected, you can reapply 2 times.
*All cut-offs are at 17:00 CE(S)T (Brussels time).
Contact us to learn more about the Women TechEU programme.
The EIC Transition is a 2-step process.
Proposals of 22 pages.
Deadline: 14/09/2027


EIC Transition is restricted to proposals based on results generated by the following eligible projects:
The EIC Pathfinder Open: Consortia of min 3 partners
The EIC Pathfinder Challenge: Single applicants or consortia of min 2 partners
The EIC Pathfinder Open is a 2-stage 3-step process.
The EIC Pathfinder Challenge is a 1-step process.
The EIC Pathfinder Open has 2 deadlines in 2027: 25/02 for Stage 1 and 16/09 for Stage 2
The EIC Pathfinder Challenge has 1 deadline in 2027: 29/09


This Challenge focuses on the development of a new generation of advanced materials,
including nanomaterials, specifically engineered to possess and exhibit novel
properties, superior to conventional materials, that can contribute to Europe’s strategic
autonomy in energy across the three main pillars – energy generation, storage and
transmission.
The Challenge supports the ambitions of the European Commission’s Clean Energy
Investment Strategy 51 and its Communication “Advanced Materials for Industrial
Leadership”52, which identified an urgent need to boost the development of advanced
materials to enhance the EU’s strategic autonomy in strategic fields while addressing
sustainability, circularity and safety issues.
Specific Objectives
Applicants to this Challenge must identify, develop and validate in the lab, devices
based on cutting-edge novel advanced materials, demonstrating significantly
enhanced performance. They should address one of the three pillars of the electricity
system:
All projects must ensure that their proposed innovations are designed for practical
implementation in devices or systems intended for grid integration. AI approaches may
be implemented to accelerate the development of advanced materials, ideally
leveraging European AI engines with data stored in Europe.
The Challenge targets interlinked risks arising from post-deployment learning, including, but not
limited to, distribution drift, normative drift57 , catastrophic forgetting, compounding errors, and
vulnerabilities such as hallucinations, poisoning, and sensor failures. Addressing these, including
maintaining auditability over time, is essential for trust, safety, and accountable AI deployment.
Specific Objectives
The main objective of the Challenge is to develop the scientific foundations, methods, and validation
assets that enable continual learning in open worlds for reliable AI models/agents deployed on
cloud, edge, or hybrid infrastructures.
Proposals should demonstrate the applicability of their approach across at least two distinct
application domains or deployment settings — spanning reliable AI agents, adaptive robotics,
digital twins, and safety-critical systems, with application domains left open (e.g. industry, health,
education, public services, etc.) — or provide a scientifically justified rationale for single-domain
validation.
Approaches should also address robust decision rules under non-stationarity (e.g., calibrated
uncertainty, adaptive thresholds, and abstention/escalation) and the safe incorporation of newly
discovered classes/concepts without uncontrolled drift or full re-engineering (including
rollback/quarantine when evidence is insufficient). Proposals should explain how the safety and
assurance of post-deployment updates will be demonstrated and governed in their intended
deployment context.
Proposals should contribute to one or more of the following specific objectives, organised by
capability:
Capability 1 — Open-World Novelty Management
Open-set recognition, unknown detection, shift diagnosis, calibrated uncertainty, adaptive decision
rules (including thresholds), and abstention/escalation policies.
Capability 2 — Reliable Continual Adaptation
Methods balancing stability and plasticity; prevention of catastrophic forgetting and harmful drift;
safe incorporation of newly discovered classes/concepts; monitor--detect--adapt--verify--rollback
loops for long-lived agents.
Capability 3 — Memory, Grounding, and Verification
Capability 4 — Robustness, Security, and Resilience under Non-Stationarity
Defences against poisoning/adversarial manipulation, including prompt injections where relevant,
under non-stationarity; safe degradation and recovery, including sensor degradation and partial
observability for physical agents.
This Challenge will address the energy cost of creating and
consuming quantum coherence. Quantum systems such as photonic platforms,
superconducting circuits, neutral atoms and trapped ions are the building blocks of
upcoming quantum processors. Their energetic assessment will allow for the
quantification of the energetic cost of processing quantum information, including
computation, communication, sensing and metrology tasks. By establishing a framework
that characterises these fundamental processes behind the exchange of energy of
elementary quantum processors, this Challenge will help to develop energy efficient open
quantum systems, and to support the classical to quantum transition60 61.
Specific Objectives
The overall goal of this Challenge is to develop energy efficient quantum technologies to
enable responsible deployment, and benchmark them against relevant, comparable
systems. Applicants to this Challenge can focus on one, and only one of the following 3
areas:
1. Full-stack quantum computing
The applicants should develop low-power quantum computing architectures, compilers
and algorithms and energy-efficient error correction schemes to minimise overhead while
enabling reliable, large-scale computation. Approaches may include circuit optimisation,
minimisation of gate count and circuit depth, improvements in error correction efficiency,
hybrid algorithm convergence, and the design of practical and basic scenarios to minimise
the energy costs of quantum processes.
Applicants should also:
2. Quantum communication
Develop energy-efficient quantum communication technologies, such as low-power
quantum repeaters and photonic quantum memories, to establish secure, long-distance
quantum networks with minimal energy consumption by defining quantum
communication energy efficiency by e.g. counting energy per secure bit (e.g., QKD),
compared to classical encryption overhead.
3. Quantum sensing
Develop miniaturised, portable ultra-low-power quantum sensors achieving superior
precision and sensitivity by establishing benchmarks for quantum sensing sensitivity per
watt and energy per measurement precision.
Starting at TRL 2, projects must clearly achieve a proof of concept by demonstrating
energetic advantages in quantum computing, communication or sensing and validating
the scientific basis of the breakthrough. Projects must reach TRL 3-4 with prototypes or
testbeds that empirically show lower energy consumption than classical counterparts (or
competitive energy advantage over state-of-the-art quantum solutions for FTQC) for the
targeted use cases.

Applicants have to submit on the EU Funding and Tenders Portal:
Four remote expert evaluators will review the documentation and decide whether it has merit to advance to the full proposal stage. The outcome of the evaluation will be sent to the applicant within 4 to 6 weeks from the date of the submission. Only short applications that receive 3 GOs out of 4 from the evaluators will be invited to submit a full proposal.

Four cut-off dates are planned for 2027:
The full proposal is submitted for review by both a technical expert evaluator and an evaluation panel composed of at least three independent experts.
The technical evaluator will examine the proposal in detail and conduct an online meeting with the applicants. The findings of this assessment will be included in a report, which will be sent to the evaluation panel.
Each independent expert within the evaluation panel will assess the proposal. The panel will then deliberate, taking into account both the individual expert assessments and the technical evaluator’s report, to determine the final score for the proposal.
Upon completion of the selection process, a ranked list of full proposals will be produced, identifying the companies invited to participate in the face‑to‑face interview stage.

The Face-to-Face Interview serves as the conclusive step in the EIC Accelerator process. It offers companies a unique opportunity to engage with a distinguished jury panel holding the authority to determine the companies selected for the EIC Accelerator.
During a comprehensive interview, the initial 10 minutes are dedicated to the pitch deck previously submitted as part of the full proposal. The interview then entails a question-and-answer session.
Following the interview, companies can expect to receive notification regarding the final outcome of their application within approximately two to three weeks. Prepare diligently for this impactful interview as it serves as the ultimate determinant for securing funding through the prestigious EIC Accelerator programme.
This Challenge complements these efforts by supporting start-ups and SMEs in
accelerating market-creating innovations for advanced ocean observation technologies
that deliver sustained, scalable, cost-effective, and high-resolution monitoring
solutions. This will in turn transform these technologies into a scalable, integrated, dual
use, and service-oriented industry.
Specific Objectives
The start-ups and SMEs to be supported under this Challenge must develop and deploy
deep-tech innovations that will address one (or more) of the following priorities:
Applicants are encouraged to engage relevant end users, including, as appropriate, those
delivering weather forecasts and climate services, shipping, fisheries and aquaculture,
offshore energy, telecommunications, insurance, environmental protection and
restoration and pollution in order to accelerate market uptake and deployment.
Indicative budget: EUR 30 million
This Challenge competition focuses on deep-tech solutions including Nature-based
Solutions (NbS) and engineering approaches.
Specific Objectives
The start-ups and SMEs to be supported under this Challenge must look to develop
and deploy deep-tech innovations that will address one of the following priorities:
To support the development of deep-tech solutions that can be deployed at scale,
applicants are strongly encouraged to engage with at least one of the cities that are
part of the Climate-Neutral and Smart Cities Mission and secure a clear commitment,
in the form of a letter of intent underlining interest in the proposed solution. Where
required, connections to these cities can be facilitated through the Cities Mission
Platform.
Where appropriate, applicants could also explore potential synergies with relevant
projects and solutions supported by the Driving Urban Transitions (DUT) Partnership.
Indicative budget: €30mn
This Challenge, supported by a transfer of budget from Euratom Research and Training
Programme, will therefore support SMEs and start-ups advancing new fusion reactor
concepts and key enabling technologies for fusion power plants.
Specific Objectives
The start-ups and SMEs to be supported under this Challenge must focus on one or
more elements of the fusion value chain including:
Indicative budget: EUR 20 million
This Challenge has the twin objective therefore of supporting the EU’s climate targets
and ensuring industrial value chain resilience by supporting technologies for carbon
removal and utilisation.
Specific Objectives
The start-ups and SMEs to be supported under this Challenge must look to develop
and deploy deep-tech innovations that will address one (or more) of the following
priorities:
Selected beneficiaries will gain access to tailored Business Acceleration Services,
including facilitated access to the EU CRCF Buyers’ Club175 for carbon removal. This will
facilitate engagement with a network of committed private buyers of carbon removal,
supporting the generation of future revenues and strengthening the underlying
business case.
Further, applicants may wish to consider engaging with European Securities and
Markets Authority (ESMA) recognised carbon ratings agency, to provide an
independent assessment of the carbon removal potential of their projects.
Solutions focused on storing captured fossil CO2 as a gas without chemical
transformation and hydrogen production technologies are not within the scope of this
Challenge.
Indicative budget: €50mn